Specialist 3D modelling of ITS roadside cabinets for major NSW transport project
SAGE delivered CAD 3D modelling and the 2D layout drawing for the design through to issue for construction for 20 roadside cabinets (RSC) for Aurecon.
SAGE Automation : Jan 31, 2024 4:23:21 PM
SAGE installed new ITS along the Monash Freeway, confidently guiding our client through challenges to deliver an end-to-end solution.
SAGE delivered CAD 3D modelling and the 2D layout drawing for the design through to issue for construction for 20 roadside cabinets (RSC) for Aurecon.
How we delivered the longest stretch of continuous managed motorway ever completed in a single Intelligent Transport System (ITS) project in Victoria.
Goulburn Murray’s water use has been optimised with a new irrigation, SCADA and telemetry system…