Award-winning project for Goulburn-Murray irrigation

Award-winning project for Goulburn-Murray irrigation

Goulburn Murray’s water use has been optimised with a new irrigation, SCADA and telemetry system…

Digital Twin simulation model enables a 24% reduction in labour costs

Digital Twin simulation model enables a 24% reduction in labour costs

A manufacturing client identifies a reduction in labour costs from $0.74/kg to $0.56/kg for the simulated processes and an increase in throughput of...

Read More
Biscuit production optimised after control system upgrade

Biscuit production optimised after control system upgrade

Arnott’s Biscuits needed flexibility in their expanding production line. A new HMI, oven system and...

Read More
Analytics and workflow solution streamlines crusher reporting

Analytics and workflow solution streamlines crusher reporting

Analytics and workflow solution streamlines crusher reporting

Read More