Snowy Hydro Angaston control system upgrade ensures compliance, faster fault finding

Snowy Hydro Angaston control system upgrade ensures compliance, faster fault finding

SAGE delivered a control system upgrade that eliminated all single points of failure for Snowy Hydro's Angaston plant and enabled faster fault finding. 

Power Management System delivered for Zero Cost Energy Future: Phase 2

Power Management System delivered for Zero Cost Energy Future: Phase 2

SAGE designed and engineered a bespoke control system that autonomously manages energy generation, conversion, and allocation for solar and...

Ignition SCADA upgrade future-proofs council water pumping station

Ignition SCADA upgrade future-proofs council water pumping station

SAGE Automation delivered a full end-to-end SCADA upgrade, including functional design specification, FAT and SAT testing with zero operational...

Ignition SCADA upgrade future-proofs council water pumping station

Ignition SCADA upgrade future-proofs council water pumping station

SAGE Automation delivered a full end-to-end SCADA upgrade, including functional design specification, FAT and SAT testing with zero operational...